Over the past few months ColoCrossing has been building its newest datacenter in Buffalo. Now that we're finished (the facility will open today, technically) I thought it was about time that we post some pictures.
We've posted a gallery on our Facebook profile at https://www.facebook.com/media/set/?set=a.876355292430676.1073741827.159574227442123&type=3
We'll be adding more pictures over the coming weeks and a formal announcement about the opening of the facility will be coming shortly.
Some details for you guys:
- 280 Cabinet Capacity Phase 1
- 1.4 Megawatt Power Capacity
- 2 x Galaxy VM 225KVA UPS units installed
- Supports up to 10 KW / cabinet power density
- CAT 3508 1 MW Generator Installed
- 7 x Liebert Air Conditioning Units
- 24 1080p Security Cameras Installed
- Biometric Security System
- Over 10 carriers available